Background

Concentric was retained to provide design, proposal development, and project management for the expansion of an existing fertilizer plant located in Yorkton, Saskatchewan.

Approach & Methodology

The expansion was to include product shipping at a capacity of 200 tonnes/hr, receiving, and 2800 tonnes of fertilizer and micronutrient storage with six (6) separations. A loading office to hold two people was also required. Concentric was responsible for the creation and submission of the project proposal to the owner. Following approval, the scope of work undertaken by Concentric included:

  • Engineering design (preliminary, foundation, structural)
  • Specification development
  • Groundwater and subsoil investigation
  • Procurement process
  • Construction, installation, and project management services
  • Commissioning

Construction of the facility expansion was completed in March of the following year.

Key Challenges

The necessary blending equipment required long lead times, creating schedule conflicts. Concentric and the general contractor mitigated this problem by fabricating custom equipment for this project.

Key Personnel

Project Directors: Russ Parker, P.Eng.& Andrew Ross, P.Eng.
Senior Technical Advisor: Allan Murray, P.Eng.

 

Design Project Management

Contact Concentric

If you would like to speak to someone about your next project, fill out the form or contact one of our offices by phone.